View this PageEdit this PageUploads to this PageVersions of this PageHomeRecent ChangesSearchHelp Guide

recon Swiki

THE CONTENT ON THIS SWIKI IS MOVING TO:
http://wiki.fcla.edu:8000/recon

PLEASE DO NOT EDIT



Final report
http://docs.google.com/Doc?docid=dqfsnq2_1g4b87knw&hl=en

Google docs version of report
http://docs.google.com/Doc?id=dhcbxj6w_1gvdp8t9z&hl=en

Budget spreadsheet
http://spreadsheets.google.com/ccc?key=puA4tsSFZ5z5CmjnkemQUcQ&hl=en
One center spreadsheet
http://spreadsheets.google.com/ccc?key=pIJiKFWVqTmj74thPeJXCTg&hl=en

Timeline
http://docs.google.com/Doc?id=dhcbxj6w_4cbmhf5sb&invite=gvbkjcw

Production
http://docs.google.com/Doc?id=dgz74k42_32dzthhjhx&hl=en

Capacity
http://docs.google.com/Doc?id=dgz74k42_34ddwc5nck&hl=en

Appendix B
http://docs.google.com/Doc?id=dhcbxj6w_7gn2wkpf9&invite=c67rxh6

Appendix G
http://spreadsheets.google.com/pub?key=pIJiKFWVqTmgjd8ZnYVr7bA


Deliverables
DELIVERABLES & IMPACT

Statewide Macro View (Primary Deliverables)
• Dynamic network for the sharing of resources among Florida SULs, both digital production resources, and information resources.

• Efficiencies in utilization of resources realized by building coordination among sister institutions.
• Mechanism to build Florida-branded content towards the threshold level for national and international participation in world digitization enterprises.
• Infrastructure completion by the end of the year 2009. A half million images accessible by the end of the five-year pilot.
• Cost-effective access to publicly held research materials through coordinated production of digital surrogates by the year 2010.
• Sustainable Web based survey of SUL hardware, software, and personnel resources in place among SULs.


Individual Institutions (Secondary Deliverables)

• Immediate access to significant research holdings at sister institutions.
• Dynamic communication networking in place by the end of academic year 2008/09.
• Significant enrichment of resource delivery to local constituents.


CONFERENCE CALL SCHEDULE
Call 352-273-4999
Oct. 15th at 1pm and call code 783 1748
Oct. 17th at 3pm and call code 783 1749
Oct. 22nd at 1pm and call code 783 1748
Oct. 24 at 3pm and call code 783 1749 (Lucy out + Cathy out)DEADLINE FOR DRAFT FINAL POSTING


Fall back # is Dial 712 775 7000. The access code for participants is 393093#.

Task Force Charge Documents

Oct. 31
Nov. 3 DEADLINE FOR FINAL REPORT TO CPC


SHAPING FLORIDA DRAFT DOCUMENTS (documents post July 11th call)

Shaping Florida DL.rtf (from Zita)
Digital Library Inventory all.doc (from Lee)
RECON resources and stakeholders.doc (from Lee)
missionvision2.doc (from Cathy, with change by Priscilla)
Running some numbers (Priscilla)
Universities and Community Colleges Records Retention Schedules
http://dlis.dos.state.fl.us/recordsmgmt/gen_records_schedules.cfm

Recon draft final report.doc
Recon draft final report.doc
Recon draft final report.doc
Recon draft final report CLM.doc (changed to numbered outline and slightly changes TEAM RECON paragraph)
Recon draft final report.doc (PC revisions on top of Cathys)
Recon draft final report Lee.doc (LD minor changes on top of Priscilla's)
Recon draft final report.doc
Recon report PC.doc


recon draft report Rev5.doc
http://spreadsheets.google.com/pub?key=puA4tsSFZ5z5CmjnkemQUcQ Don't use this

Minutes Conference Call 10-1-08.doc
Minutes Conference Call 10-3-08.doc
Minutes Conference Call 10-15-08.doc
Minutes conference call 10-17-08.doc
Minutes conference call 10-22-08.doc